Futian · Seven Residences
福田案 · 七戶透天住宅
Turning residential planning into built experience.

Design approach
Leading the developer-side process from planning to handover: coordinating plans, elevations and details with the design team, construction interfaces and quality, buyer change requests, procurement and sales support.
Connection to research
Closing the loop between design, site and sales showed how often site conditions surface too late—the gap RSA now studies.
- Year
- 2022–2025
- Location
- Xinpu, Hsinchu
- Role
- Developer-side project lead (founder, for a former employer)
- Type
- Residential · 7 townhouses
- Context
- Seven townhouses · handed over February 2025
This is the founder’s prior-employment experience: work performed for a former employer, not an RSA commission. No RSA-based environmental analysis is claimed for this project. Images are design visualisations of the project.



Scope of work
Project coordination
Cross-department collaboration and meeting integration
Design integration
Plans, elevations and details, coordinated with the design team
Construction coordination
Trade interfaces and quality control on site
Buyer changes
Requirements and changes from buyers, folded back into planning
Sales support
Product positioning and after-sales process
Procurement
Specifications, cost and progress reporting
Outcome
Built a design–site–sales information loop that reduced gaps and errors, and carried the project from planning to handover while holding quality, schedule and budget.
This work was done by the founder while employed by a residential developer, before RSA was founded. RSA as a company had no role in this project. Statutory architectural design and sign-off were not part of this role.